Metal Fabrication — Milwaukee, WI

Large, Complex Weldments.
Tight Timelines. Difficult Jobs.

Cutting Edge Fabrication manufactures mid-to-large, complex weldments and mechanical assemblies for OEM programs where process control, responsiveness, and reliable execution matter.

Heavy equipment. Power generation. Civil infrastructure. Bulk material handling. ISO 9001:2015 certified — Milwaukee, WI — Since 1990.

CEF at a Glance

  • ISO 9001:2015 Certified
  • 65,000 sq ft Milwaukee facility
  • Parts and structures to 20,000 lb
  • Lengths to 60 feet
  • Certified welders — all processes
  • Laser, plasma, oxy-fuel, shear, saw
  • On-site CNC machining
  • Full assembly in-house
Send Us Your Drawing
ISO 9001:2015Quality Certified
Est. 199035+ Years
65,000 Sq FtMilwaukee Facility
20,000 LbMaterial Capacity
Southeast WI+ Northern IL

Why CEF

Built for jobs that require more than standard execution

Most fab shops can handle straightforward work. Send us something with tight distortion requirements, a compressed timeline, or a weld sequence that actually has to be planned — that’s where we’re built differently.

The fixturing, weld sequencing, in-process checks, and final inspection do not happen by accident. They are part of how CEF controls complex fabrication work from start to finish.

  • Mid-to-large weldments requiring process control, not just equipment
  • Responsive when your program changes or timelines compress
  • ISO 9001:2015 quality system — documented through every operation
  • One-source delivery: cutting through assembly under one roof
  • 65,000 sq ft Milwaukee facility — accessible from I-43 and US-45
  • In business since 1990 — stable, experienced team
  • Response within one business day on drawings submitted
Cutting Edge Fabrication — shop floor overview video showing welding, plasma cutting, and large structural assembly - metal fabrication Milwaukee

See CEF in action — welding, cutting, and assembly

35+
Years in Business
65K
Sq Ft Facility

Ready to Work Together

Have a weldment that needs a reliable partner?

Send us your drawing, spec sheet, or job description. We’ll review it, ask the right questions, and give you a straight answer on fit and timeline.

DXF, DWG, PDF, SolidWorks, STEP — all accepted. Response within one business day.

Common Questions

Frequently Asked Questions About CEF Metal Fabrication

Questions we hear from engineers and procurement managers evaluating CEF for the first time.

CEF is best suited for mid-to-large structural weldments and assemblies where complexity, tight tolerances, or compressed timelines make execution challenging. If your part is large, involves multiple processes, or requires documented quality control, CEF is built for that work.

We accept DXF, DWG, PDF, SolidWorks, STEP, and IGES files. Preliminary sketches and supporting specifications are also useful when a production drawing is not yet available.

Lead time depends on material availability, project complexity, required processes, quantity, and current shop loading. Send us the drawing and your target date, and we will evaluate timing as part of the quote.

We work with structural steel, carbon steel, stainless steel, aluminum, and a range of specialty alloys. If you’re unsure whether we process your material, send us the spec and we’ll tell you directly.

Both. CEF can handle cutting, forming, welding, CNC machining, and full assembly in-house. Finishing services including sandblasting, painting, powder coating, plating, and galvanizing can also be included as part of the completed program.

CEF is located at 6030 North 60th Street, Milwaukee, WI 53218 — accessible from I-43 and US-45. We primarily serve Southeast Wisconsin and Northern Illinois but work with customers throughout the United States.