Metal Fabrication — Milwaukee, WI
Large, Complex Weldments.
Tight Timelines. Difficult Jobs.
Cutting Edge Fabrication builds the weldments other shops decline — large, complex, tight-tolerance structural assemblies for OEMs who can’t afford surprises on a program.
Heavy equipment. Power generation. Civil infrastructure. Bulk material handling. ISO 9001:2015 certified — Milwaukee, WI — Since 1990.
CEF at a Glance
- ISO 9001:2015 Certified
- 65,000 sq ft Milwaukee facility
- Parts and structures to 20,000 lb
- Lengths to 60 feet
- Certified welders — all processes
- Laser, plasma, oxy-fuel, shear, saw
- On-site CNC machining
- Full assembly and finishing
Markets We Serve
Four Milwaukee Metal Fabrication Markets. One Focused Fabricator.
CEF is building a concentrated presence in four industrial markets where large, complex weldments are critical — and where reliability when timelines are tight matters most.
Heavy Equipment & Mining
Structural frames, undercarriage components, equipment housings, wear parts, and complex weldments for mining, earthmoving, and heavy construction OEMs.
View this pillar →Power Generation & Energy Infrastructure
Structural components, housings, skids, and assemblies for power generation, transmission infrastructure, and industrial energy systems.
View this pillar →Civil Infrastructure & Water Control
Gates, frames, weirs, sluice structures, containment vessels, and fabricated components for water treatment, flood control, and civil projects.
View this pillar →Bulk Material Handling & Industrial Systems
Hoppers, chutes, conveyors, screens, frames, and structural assemblies for aggregate, mining, cement, grain, and industrial processing systems.
View this pillar →Recent Work
Jobs we’ve completed
Real fabrication work from our shop floor. Each job shows what we built, why it mattered, and what made it work.
Why CEF
Built for jobs that require more than standard execution
Most fab shops can handle straightforward work. Send us something with tight distortion requirements, a compressed timeline, or a weld sequence that actually has to be planned — that’s where we’re built differently.
The fixturing, the pre-heat, the in-process checks — none of that happens by accident. It’s how we’ve run jobs since 1990, and it’s why customers keep coming back with their harder programs.
- Mid-to-large weldments requiring process control, not just equipment
- Responsive when your program changes or timelines compress
- ISO 9001:2015 quality system — documented through every operation
- One-source delivery: cutting through assembly under one roof
- 65,000 sq ft Milwaukee facility — accessible from I-43 and US-45
- In business since 1990 — stable, experienced team
- Response within one business day on drawings submitted
Ready to Work Together
Have a weldment that needs a reliable partner?
Send us your drawing, spec sheet, or job description. We’ll review it, ask the right questions, and give you a straight answer on fit and timeline.
DXF, DWG, PDF, SolidWorks, STEP — all accepted. Response within one business day.
Common Questions
Frequently Asked About CEF Metal Fabrication
Questions we hear from engineers and procurement managers evaluating CEF for the first time.
