Metal Fabrication — Milwaukee, WI
Large, Complex Weldments.
Tight Timelines. Difficult Jobs.
Cutting Edge Fabrication manufactures mid-to-large, complex weldments and mechanical assemblies for OEM programs where process control, responsiveness, and reliable execution matter.
Heavy equipment. Power generation. Civil infrastructure. Bulk material handling. ISO 9001:2015 certified — Milwaukee, WI — Since 1990.
CEF at a Glance
- ISO 9001:2015 Certified
- 65,000 sq ft Milwaukee facility
- Parts and structures to 20,000 lb
- Lengths to 60 feet
- Certified welders — all processes
- Laser, plasma, oxy-fuel, shear, saw
- On-site CNC machining
- Full assembly in-house
Markets We Serve
Focused on Key Markets. Capable Across Many More.
CEF is building a concentrated presence in key industrial markets where large, complex weldments are critical — and where reliability when timelines are tight matters most. These four represent our core focus, not the limits of what we fabricate.
Heavy Equipment & Mining
Medium-to-large fabricated parts, mechanical assemblies, and complex weldments for mining, earthmoving, and heavy construction OEMs.
View this pillar →Power Generation & Energy Infrastructure
Medium-to-large fabricated parts and mechanical assemblies for power generation and energy infrastructure programs.
View this pillar →Civil Infrastructure & Water Control
Structural fabrication and complex weldments for civil infrastructure and water-control programs, built to customer drawings and specifications.
View this pillar →Bulk Material Handling & Industrial Systems
Concrete surge hoppers, telescopic conveyor systems, and other medium-to-large fabricated structures for material handling and industrial systems.
View this pillar →Recent Work
Jobs we’ve completed
Real fabrication work from our shop floor. Each job shows what we built, why it mattered, and what made it work.
Why CEF
Built for jobs that require more than standard execution
Most fab shops can handle straightforward work. Send us something with tight distortion requirements, a compressed timeline, or a weld sequence that actually has to be planned — that’s where we’re built differently.
The fixturing, weld sequencing, in-process checks, and final inspection do not happen by accident. They are part of how CEF controls complex fabrication work from start to finish.
- Mid-to-large weldments requiring process control, not just equipment
- Responsive when your program changes or timelines compress
- ISO 9001:2015 quality system — documented through every operation
- One-source delivery: cutting through assembly under one roof
- 65,000 sq ft Milwaukee facility — accessible from I-43 and US-45
- In business since 1990 — stable, experienced team
- Response within one business day on drawings submitted
Ready to Work Together
Have a weldment that needs a reliable partner?
Send us your drawing, spec sheet, or job description. We’ll review it, ask the right questions, and give you a straight answer on fit and timeline.
DXF, DWG, PDF, SolidWorks, STEP — all accepted. Response within one business day.
Common Questions
Frequently Asked Questions About CEF Metal Fabrication
Questions we hear from engineers and procurement managers evaluating CEF for the first time.
