---
title: "Metal Fabrication Milwaukee | Cutting Edge Fabrication"
description: "Metal fabrication Milwaukee. Large weldments for heavy equipment, power generation, civil infrastructure, and material handling. ISO 9001:2015 certified."
date: "2026-06-05T14:04:25+00:00"
language: "en-US"
canonical_url: "https://hj9qwrklpbvho98.onstatic.studio/"
source_url: "https://hj9qwrklpbvho98.onstatic.studio/"
content_type: "text/markdown"
---

Metal Fabrication — Milwaukee, WI



#
        Large, Complex Weldments.

        Tight Timelines. Difficult Jobs.




        Cutting Edge Fabrication manufactures mid-to-large, complex weldments and mechanical assemblies for OEM programs where process control, responsiveness, and reliable execution matter.




        Heavy equipment. Power generation. Civil infrastructure. Bulk material handling.
        ISO 9001:2015 certified — Milwaukee, WI — Since 1990.



        [Submit a Drawing](https://hj9qwrklpbvho98.onstatic.studio/contact/)
        [See Our Work](https://hj9qwrklpbvho98.onstatic.studio/projects/)



        [Heavy Equipment & Mining →](https://hj9qwrklpbvho98.onstatic.studio/heavy-equipment-mining/)
        [Power Generation →](https://hj9qwrklpbvho98.onstatic.studio/power-generation-energy/)
        [Civil Infrastructure →](https://hj9qwrklpbvho98.onstatic.studio/civil-infrastructure-water/)
        [Material Handling →](https://hj9qwrklpbvho98.onstatic.studio/bulk-material-handling/)







CEF at a Glance



        - ISO 9001:2015 Certified

        - 65,000 sq ft Milwaukee facility

        - Parts and structures to 20,000 lb

        - Lengths to 60 feet

        - Certified welders — all processes

        - Laser, plasma, oxy-fuel, shear, saw

        - On-site CNC machining

        - Full assembly in-house



      [Send Us Your Drawing](https://hj9qwrklpbvho98.onstatic.studio/contact/)






      **ISO 9001:2015**Quality Certified
      **Est. 1990**35+ Years
      **65,000 Sq Ft**Milwaukee Facility
      **20,000 Lb**Material Capacity
      **Southeast WI**+ Northern IL







Markets We Serve

## Focused on Key Markets. Capable Across Many More.



CEF is building a concentrated presence in key industrial markets where large, complex weldments are critical — and where reliability when timelines are tight matters most. These four represent our core focus, not the limits of what we fabricate.



      [
  Pillar 1


### Heavy Equipment & Mining



Medium-to-large fabricated parts, mechanical assemblies, and complex weldments for mining, earthmoving, and heavy construction OEMs.

  View this pillar →
](https://hj9qwrklpbvho98.onstatic.studio/heavy-equipment-mining/)

[
  Pillar 2


### Power Generation & Energy Infrastructure



Medium-to-large fabricated parts and mechanical assemblies for power generation and energy infrastructure programs.

  View this pillar →
](https://hj9qwrklpbvho98.onstatic.studio/power-generation-energy/)

[
  Pillar 3


### Civil Infrastructure & Water Control



Structural fabrication and complex weldments for civil infrastructure and water-control programs, built to customer drawings and specifications.

  View this pillar →
](https://hj9qwrklpbvho98.onstatic.studio/civil-infrastructure-water/)

[
  Pillar 4


### Bulk Material Handling & Industrial Systems



Concrete surge hoppers, telescopic conveyor systems, and other medium-to-large fabricated structures for material handling and industrial systems.

  View this pillar →
](https://hj9qwrklpbvho98.onstatic.studio/bulk-material-handling/)







Recent Work



## Jobs we’ve completed



Real fabrication work from our shop floor. Each job shows what we built, why it mattered, and what made it work.


      [
        ![Concrete surge hoppers — 5,000 lb steel weldment, 50+ components, Milwaukee fabrication](https://hj9qwrklpbvho98.onstatic.studio/wp-content/uploads/2026/06/custom-metal-fabrication-hopper.jpg)

          Bulk Material Handling


### Concrete Surge Hoppers



50+ components · 5,000 lb · 25.5 ft assembled


      ](https://hj9qwrklpbvho98.onstatic.studio/projects/concrete-surge-hoppers/)
      [
        ![Telescopic conveyor system — 800 welded steel components, 30,000 lb, 150 ft extended](https://hj9qwrklpbvho98.onstatic.studio/wp-content/uploads/2026/06/telescopic-conveyor-fabrication.jpg)

          Bulk Material Handling


### Telescopic Conveyor System



800+ components · 30,000 lb combined system · 150 ft extended


      ](https://hj9qwrklpbvho98.onstatic.studio/projects/telescopic-conveyor/)
      [
        ![Custom industrial shot blasting equipment fabrication](https://hj9qwrklpbvho98.onstatic.studio/wp-content/uploads/2026/06/shot-blasting-equipment-fabrication.jpg)

          Heavy Equipment


### Shot Blasting Equipment



Cabinets · Housings · Drums · Custom sizes


      ](https://hj9qwrklpbvho98.onstatic.studio/projects/shot-blasting-equipment/)


      [All projects](https://hj9qwrklpbvho98.onstatic.studio/projects/)





Why CEF



## Built for jobs that require more than standard execution



Most fab shops can handle straightforward work. Send us something with tight distortion requirements, a compressed timeline, or a weld sequence
that actually has to be planned — that’s where we’re built differently.



The fixturing, weld sequencing, in-process checks, and final inspection do not happen by accident. They are part of how CEF controls complex fabrication work from start to finish.

  - Mid-to-large weldments requiring process control, not just equipment

  - Responsive when your program changes or timelines compress

  - ISO 9001:2015 quality system — documented through every operation

  - One-source delivery: cutting through assembly under one roof

  - 65,000 sq ft Milwaukee facility — accessible from I-43 and US-45

  - In business since 1990 — stable, experienced team

  - Response within one business day on drawings submitted

[Get a Quote

](https://hj9qwrklpbvho98.onstatic.studio/contact/)

[


  ![Cutting Edge Fabrication — shop floor overview video showing welding, plasma cutting, and large structural assembly - metal fabrication Milwaukee](https://hj9qwrklpbvho98.onstatic.studio/wp-content/uploads/2026/06/CEF-YT-Thumbnail.jpg)








](https://youtu.be/yym-2HqY9ZA)

See CEF in action — welding, cutting, and assembly


    35+
    Years in Business


    65K
    Sq Ft Facility





Ready to Work Together



##
      Have a weldment that needs a reliable partner?




      Send us your drawing, spec sheet, or job description. We’ll review it, ask the right questions, and give you a straight answer on fit and timeline.




      DXF, DWG, PDF, SolidWorks, STEP — all accepted. Response within one business day.



      [Submit a Drawing](https://hj9qwrklpbvho98.onstatic.studio/contact/)
      [See Our Work First](https://hj9qwrklpbvho98.onstatic.studio/projects/)






Common Questions



##
  Frequently Asked Questions About CEF Metal Fabrication



      Questions we hear from engineers and procurement managers evaluating CEF for the first time.




What types of projects is CEF best suited for?

CEF is best suited for mid-to-large structural weldments and assemblies where complexity, tight tolerances, or compressed timelines make execution challenging. If your part is large, involves multiple processes, or requires documented quality control, CEF is built for that work.

What file formats do you accept for RFQ submissions?

We accept DXF, DWG, PDF, SolidWorks, STEP, and IGES files. Preliminary sketches and supporting specifications are also useful when a production drawing is not yet available.

What is CEF’s typical lead time?

Lead time depends on material availability, project complexity, required processes, quantity, and current shop loading. Send us the drawing and your target date, and we will evaluate timing as part of the quote.

What materials does CEF work with?

We work with structural steel, carbon steel, stainless steel, aluminum, and a range of specialty alloys. If you’re unsure whether we process your material, send us the spec and we’ll tell you directly.

Does CEF handle full assemblies or just fabricated components?

Both. CEF can handle cutting, forming, welding, CNC machining, and full assembly in-house. Finishing services including sandblasting, painting, powder coating, plating, and galvanizing can also be included as part of the completed program.

Where is CEF located and what areas do you serve?

CEF is located at 6030 North 60th Street, Milwaukee, WI 53218 — accessible from I-43 and US-45. We primarily serve Southeast Wisconsin and Northern Illinois but work with customers throughout the United States.
